Installation Inspection Checklist

It is highly recommended that your new equipment be installed by our experienced and Mopec-certified installation team. In the event that Mopec will not be installing or present during the final connections of your equipment, the completion of ISO INS-030 is needed to register and activate your Warranty. 

Once the necessary documentation is received and reviewed for approval, you will be notified in writing of your warranty coverage. Failure to submit INS-030 and documentation within 30 days from final install will require a field verification performed by Mopec at an additional fee.

Contact your Mopec Project Managers or Customer Service for a copy of INS-030 or with any questions during this process.

Installation Inspection Checklist

MM slash DD slash YYYY
MM slash DD slash YYYY
We will send the Warranty Certificate to this email address.
Facility Address(Required)

Instructions

The purpose of this form is to aid in the installation and connection of the equipment. This form is needed along with pictures to verify equipment was installed correctly. Once the necessary documentation is received and reviewed for approval, you will be notified in writing of your warranty coverage. Some items may not pertain to your equipment and would be N/A. This form must be submitted within 30 days of final installation. If it is after 30 days, the inspection will need to be performed by Mopec for an additional fee.
1. Make sure nothing is obstructing the equipment on all sides and the back.(Required)
2. Verify the equipment is level. There should be no rocking or instability.(Required)
3a. If applicable, verify adjustment of the leveling feet. There should be 1/4" to 1/2" air space under a Grossing Station, as shown in the image.(Required)
This is required for grossing stations. For any other equipment, continue to number 4.
Max. file size: 128 MB.
4a. Verify how the power is connected to the unit, as shown in the image. For more information, please see the Product Manual.(Required)
Max. file size: 128 MB.
5. Check to see if the main power switch works properly.(Required)
6. Verify the GFCI breakers work properly.(Required)
7. If applicable, verify the garbage disposal works properly.(Required)
8a. If applicable, verify the display screen works properly, as shown in the image.(Required)
This is required for Maestro Grossing Stations. For any other equipment, continue to number 9.
Max. file size: 128 MB.
9a. Check plumbing connections for leaks, as shown in the image.(Required)
Max. file size: 128 MB.
10a. Verify the factory-installed "P" trap bracket is in place and has not been removed or modified, as shown in the image.(Required)
Max. file size: 128 MB.
11a. Verify that the ventilation and the band clamps installed on the flexible ducts are connected and working, as shown in the image.(Required)
Max. file size: 128 MB.
12a. If applicable, some equipment needs to be anchored. Please verify your equipment is anchored correctly, as shown in the image.(Required)
Max. file size: 128 MB.
13. For floor-mounted and wall-mounted equipment, it needs to be sealed properly. If applicable, verify your equipment has been caulked to the floor or wall correctly.(Required)
14. If applicable, verify the up/down elevation works properly.(Required)
15. For wall-mounted sinks, check that the support brackets are bolted to the sink and to the wall securely.(Required)